250 kW DC-Coupled PV-Storage in a Shanghai Office Tower

A 250 kW DC-coupled PV-storage system sits on the roof of a Shanghai office building. The DC bus feeds LED lighting and IT racks directly. No AC inverters per floor, no per-room transformers. One cabinet, two bus voltages.

PV + Storage + EV Charging, One Logistics Yard, Pakistan

A 100 kW rooftop PV array, a battery rack, and an EV charging bay share a single off-the-shelf container in a logistics yard outside Lahore. The container was built in Jinan, shipped, and put into service by the local electrical contractor.

200 kW Storage Cabinet in Huzhou: Winter Spike, Textile Mill

A 200 kW PCS plus a 430 kWh battery rack sits in the basement of a polyester weaving mill in Huzhou. The cabinet runs the winter peak and backstops the local grid during substation maintenance. Six months of operating data, courtesy of the site owner.

500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two

A 500 kW lithium-iron-phosphate storage system, paired with our PCS, runs on the grid side of a zinc smelter in Zibo. Two summers in, the operators say the peak bill dropped by enough to make the second cabinet worth ordering.