{"id":9764,"date":"2026-08-30T17:43:17","date_gmt":"2026-08-30T17:43:17","guid":{"rendered":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/"},"modified":"2026-08-30T17:43:17","modified_gmt":"2026-08-30T17:43:17","slug":"zibo-500kw-pcs-zinc-smelter-peak-shaving","status":"publish","type":"post","link":"https:\/\/dminverter.com\/pl\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/","title":{"rendered":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The smelter draws hard in the late afternoon, then drops to a base load overnight. Shandong&#8217;s peak-valley price spread is wide enough that running a battery through one full peak cycle per day pays back the cabinet inside the warranty window. We have shipped two of them to the same site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first went in during a planned shutdown, so the install could ride the existing main transformer through the cut-over. The second was a clean retrofit: same cabinet rating, different cell supplier, different local integrator. We have learned the hard way that battery-vendor lock-in is rarely the PCS supplier&#8217;s decision. The cabinet should not care which cell is bolted to the other side.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp\" alt=\"500 kW PCS cabinet installed at a zinc smelter in Zibo\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Cabinet specification<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>500 kW bidirectional PCS, 600&ndash;1500 V DC battery side<\/li>\n<li>400 V AC three-phase output, 50 Hz, transformer step-up to 10 kV on site<\/li>\n<li>LiFePO4 battery, 1 MWh rated, containerised<\/li>\n<li>Full cabinet pre-assembled in Jinan and tested under load before dispatch<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Operating notes from year one<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The site runs the cabinet on two cycles: a hard peak cut from 14:00 to 21:00, and a soft standby hold overnight to keep the cell temperature inside the BMS window. The cabinet logs cycle count and round-trip efficiency on every dispatch. After 12 months the operators handed us the report without us asking for it &mdash; round-trip efficiency was 96.4% at the cabinet AC terminals, which is the number we measure in the factory, not the marketing number that everyone tends to put on a brochure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The second cabinet was ordered with a small change: the BMS protocol stack added one extra vendor (the cell supplier changed). The cabinet itself was identical. That was the whole reason we standardised on a single Modbus \/ CAN gateway in the first place &mdash; so swapping cells is a software update, not a hardware change.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Where this fits<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If you are sizing a cabinet for industrial peak shaving, the two numbers that matter are the peak price spread on your local tariff and the round-trip efficiency of the cabinet you are buying. Everything else is secondary. Get those two right and the payback arithmetic looks the same in Zibo and in Johannesburg.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Contact: <a href=\"mailto:58298175@qq.com\">58298175@qq.com<\/a> \/ +86-181-5931-0123.<\/p>","protected":false},"excerpt":{"rendered":"<p>A 500 kW lithium-iron-phosphate storage system, paired with our PCS, runs on the grid side of a zinc smelter in Zibo. Two summers in, the operators say the peak bill dropped by enough to make the second cabinet worth ordering.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"_kad_post_classname":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-9764","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/dminverter.com\/pl\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/\" \/>\n<meta property=\"og:locale\" content=\"pl_PL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -\" \/>\n<meta property=\"og:description\" content=\"A 500 kW lithium-iron-phosphate storage system, paired with our PCS, runs on the grid side of a zinc smelter in Zibo. Two summers in, the operators say the peak bill dropped by enough to make the second cabinet worth ordering.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/dminverter.com\/pl\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-30T17:43:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp\" \/>\n<meta name=\"author\" content=\"DEMING\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napisane przez\" \/>\n\t<meta name=\"twitter:data1\" content=\"DEMING\" \/>\n\t<meta name=\"twitter:label2\" content=\"Szacowany czas czytania\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minuty\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/\"},\"author\":{\"name\":\"DEMING\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#\\\/schema\\\/person\\\/818e0e08da234aa197c53009d987d946\"},\"headline\":\"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two\",\"datePublished\":\"2026-08-30T17:43:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/\"},\"wordCount\":370,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dminverter.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pcs-zibo-500kw.webp\",\"articleSection\":[\"Discover&amp;News\"],\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/\",\"url\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/\",\"name\":\"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/dminverter.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pcs-zibo-500kw.webp\",\"datePublished\":\"2026-08-30T17:43:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#breadcrumb\"},\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#primaryimage\",\"url\":\"https:\\\/\\\/dminverter.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pcs-zibo-500kw.webp\",\"contentUrl\":\"https:\\\/\\\/dminverter.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/pcs-zibo-500kw.webp\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/2026\\\/08\\\/30\\\/zibo-500kw-pcs-zinc-smelter-peak-shaving\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/dminverter.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#website\",\"url\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/\",\"name\":\"Jinan Deming Power Equipment Co., Ltd.\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pl-PL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#organization\",\"name\":\"Jinan Deming Power Equipment Co., Ltd.\",\"url\":\"https:\\\/\\\/dminverter.com\",\"logo\":\"https:\\\/\\\/dminverter.com\\\/wp-content\\\/uploads\\\/2024\\\/06\\\/deming-logo.png\",\"image\":{\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"alternateName\":\"Deming Power\",\"description\":\"Jinan Deming Power is a Chinese manufacturer of industrial-grade power conversion equipment: pure sine wave inverters (10 kW to 1 MW), solar hybrid \\\/ off-grid inverters, wind turbine inverters, energy storage bidirectional converters (PCS), DC\\\/DC converters and frequency converters. Established 2004, exporting to 120+ countries. OEM\\\/ODM, factory-direct quotes available.\",\"foundingDate\":\"2004\",\"foundingLocation\":{\"@type\":\"Place\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"No. 888, Mingtang Road, Lixia District\",\"addressLocality\":\"Jinan\",\"addressRegion\":\"Shandong\",\"postalCode\":\"250101\",\"addressCountry\":\"CN\"}},\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"No. 888, Mingtang Road, Lixia District\",\"addressLocality\":\"Jinan\",\"addressRegion\":\"Shandong\",\"postalCode\":\"250101\",\"addressCountry\":\"CN\"},\"email\":\"58298175@qq.com\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"telephone\":\"+86-181-5931-0123\",\"email\":\"58298175@qq.com\",\"contactOption\":\"TollFree\",\"areaServed\":[\"CN\",\"US\",\"EU\",\"AU\",\"RU\",\"ES\",\"PL\",\"NL\",\"FR\",\"KZ\",\"AE\",\"NG\",\"ZA\",\"BR\",\"IN\",\"TH\",\"VN\",\"ID\",\"PK\",\"UZ\",\"KE\"],\"availableLanguage\":[\"en\",\"es\",\"fr\",\"pl\",\"nl\",\"ru\",\"zh\"]}],\"sameAs\":[\"https:\\\/\\\/dminverter.en.made-in-china.com\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/jinan-deming-power\"],\"knowsAbout\":[\"Industrial Power Inverters\",\"Solar Hybrid Inverters\",\"Off-Grid Power Systems\",\"Wind Turbine Inverters\",\"Energy Storage Converters (PCS)\",\"Bidirectional DC-DC Converters\",\"Variable Frequency Power Supplies\",\"Wind-Solar Hybrid Systems\",\"Microgrid Solutions\"],\"award\":[\"High and New Technology Enterprise (recognized three times, 2015 \\\/ 2018 \\\/ 2024)\",\"Jinan Specialized, Refined, Differentiated and Innovative SME\",\"Member of the standing council of China Wind Energy Association\",\"Participant in the formulation of IEC international standards for small wind turbines\",\"5 National Invention Patents, 12 Utility Model Patents, 5 Software Copyrights\"],\"member\":[\"China Wind Energy Association (Standing Council Member)\",\"China Renewable Energy Society\"],\"areaServed\":{\"@type\":\"AdministrativeArea\",\"name\":\"120+ countries across Asia, Africa, Europe, Latin America and Oceania (80% of production exported)\"},\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":50,\"maxValue\":200}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/dminverter.com\\\/ru\\\/#\\\/schema\\\/person\\\/818e0e08da234aa197c53009d987d946\",\"name\":\"DEMING\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g\",\"caption\":\"DEMING\"},\"sameAs\":[\"http:\\\/\\\/www.dminverter.com\"],\"url\":\"https:\\\/\\\/dminverter.com\\\/pl\\\/author\\\/word\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/dminverter.com\/pl\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/","og_locale":"pl_PL","og_type":"article","og_title":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -","og_description":"A 500 kW lithium-iron-phosphate storage system, paired with our PCS, runs on the grid side of a zinc smelter in Zibo. Two summers in, the operators say the peak bill dropped by enough to make the second cabinet worth ordering.","og_url":"https:\/\/dminverter.com\/pl\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/","article_published_time":"2026-08-30T17:43:17+00:00","og_image":[{"url":"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp","type":"","width":"","height":""}],"author":"DEMING","twitter_card":"summary_large_image","twitter_misc":{"Napisane przez":"DEMING","Szacowany czas czytania":"2 minuty"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#article","isPartOf":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/"},"author":{"name":"DEMING","@id":"https:\/\/dminverter.com\/ru\/#\/schema\/person\/818e0e08da234aa197c53009d987d946"},"headline":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two","datePublished":"2026-08-30T17:43:17+00:00","mainEntityOfPage":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/"},"wordCount":370,"commentCount":0,"publisher":{"@id":"https:\/\/dminverter.com\/ru\/#organization"},"image":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#primaryimage"},"thumbnailUrl":"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp","articleSection":["Discover&amp;News"],"inLanguage":"pl-PL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/","url":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/","name":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two -","isPartOf":{"@id":"https:\/\/dminverter.com\/ru\/#website"},"primaryImageOfPage":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#primaryimage"},"image":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#primaryimage"},"thumbnailUrl":"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp","datePublished":"2026-08-30T17:43:17+00:00","breadcrumb":{"@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#breadcrumb"},"inLanguage":"pl-PL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/"]}]},{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#primaryimage","url":"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp","contentUrl":"https:\/\/dminverter.com\/wp-content\/uploads\/2026\/08\/pcs-zibo-500kw.webp"},{"@type":"BreadcrumbList","@id":"https:\/\/dminverter.com\/2026\/08\/30\/zibo-500kw-pcs-zinc-smelter-peak-shaving\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/dminverter.com\/"},{"@type":"ListItem","position":2,"name":"500 kW PCS for a Zinc Smelter in Zibo: Peak-Shaving, Year Two"}]},{"@type":"WebSite","@id":"https:\/\/dminverter.com\/ru\/#website","url":"https:\/\/dminverter.com\/ru\/","name":"Jinan Deming Power Equipment Co., Ltd.","description":"","publisher":{"@id":"https:\/\/dminverter.com\/ru\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/dminverter.com\/ru\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pl-PL"},{"@type":"Organization","@id":"https:\/\/dminverter.com\/ru\/#organization","name":"Jinan Deming Power Equipment Co., Ltd.","url":"https:\/\/dminverter.com","logo":"https:\/\/dminverter.com\/wp-content\/uploads\/2024\/06\/deming-logo.png","image":{"@id":"https:\/\/dminverter.com\/ru\/#\/schema\/logo\/image\/"},"alternateName":"Deming Power","description":"Jinan Deming Power is a Chinese manufacturer of industrial-grade power conversion equipment: pure sine wave inverters (10 kW to 1 MW), solar hybrid \/ off-grid inverters, wind turbine inverters, energy storage bidirectional converters (PCS), DC\/DC converters and frequency converters. Established 2004, exporting to 120+ countries. OEM\/ODM, factory-direct quotes available.","foundingDate":"2004","foundingLocation":{"@type":"Place","address":{"@type":"PostalAddress","streetAddress":"No. 888, Mingtang Road, Lixia District","addressLocality":"Jinan","addressRegion":"Shandong","postalCode":"250101","addressCountry":"CN"}},"address":{"@type":"PostalAddress","streetAddress":"No. 888, Mingtang Road, Lixia District","addressLocality":"Jinan","addressRegion":"Shandong","postalCode":"250101","addressCountry":"CN"},"email":"58298175@qq.com","contactPoint":[{"@type":"ContactPoint","contactType":"sales","telephone":"+86-181-5931-0123","email":"58298175@qq.com","contactOption":"TollFree","areaServed":["CN","US","EU","AU","RU","ES","PL","NL","FR","KZ","AE","NG","ZA","BR","IN","TH","VN","ID","PK","UZ","KE"],"availableLanguage":["en","es","fr","pl","nl","ru","zh"]}],"sameAs":["https:\/\/dminverter.en.made-in-china.com","https:\/\/www.linkedin.com\/company\/jinan-deming-power"],"knowsAbout":["Industrial Power Inverters","Solar Hybrid Inverters","Off-Grid Power Systems","Wind Turbine Inverters","Energy Storage Converters (PCS)","Bidirectional DC-DC Converters","Variable Frequency Power Supplies","Wind-Solar Hybrid Systems","Microgrid Solutions"],"award":["High and New Technology Enterprise (recognized three times, 2015 \/ 2018 \/ 2024)","Jinan Specialized, Refined, Differentiated and Innovative SME","Member of the standing council of China Wind Energy Association","Participant in the formulation of IEC international standards for small wind turbines","5 National Invention Patents, 12 Utility Model Patents, 5 Software Copyrights"],"member":["China Wind Energy Association (Standing Council Member)","China Renewable Energy Society"],"areaServed":{"@type":"AdministrativeArea","name":"120+ countries across Asia, Africa, Europe, Latin America and Oceania (80% of production exported)"},"numberOfEmployees":{"@type":"QuantitativeValue","minValue":50,"maxValue":200}},{"@type":"Person","@id":"https:\/\/dminverter.com\/ru\/#\/schema\/person\/818e0e08da234aa197c53009d987d946","name":"DEMING","image":{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/secure.gravatar.com\/avatar\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1c2f68a021475d2234e41333237d528629d4ddae4a3e246b08ff1bf0a1d35658?s=96&d=mm&r=g","caption":"DEMING"},"sameAs":["http:\/\/www.dminverter.com"],"url":"https:\/\/dminverter.com\/pl\/author\/word\/"}]}},"_links":{"self":[{"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/posts\/9764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/comments?post=9764"}],"version-history":[{"count":0,"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/posts\/9764\/revisions"}],"wp:attachment":[{"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/media?parent=9764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/categories?post=9764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dminverter.com\/pl\/wp-json\/wp\/v2\/tags?post=9764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}